Next-Gen HPC Data CenterNext-Gen HPC Data Center
Design, permitting, and construction of a 1M+ GSF high-performance computing campus built for complex simulation, big data, and AI workloads.

The project consists of the design and construction of a 12,000+ GSF annex attached to an existing operational mission-critical facility, supporting materials recovery and reuse on the campus.
A compact footprint does not make the delivery simple. Tie-ins to live services, restricted laydown, phased access, and security clearance requirements drive the schedule more than the construction scope itself does.

Decima manages the design, procurement, and construction interfaces, with the schedule built around facility access windows rather than around the contractor's preferred sequence.
Additional project profiles with related sector, delivery, technology, or program characteristics.
Next-Gen HPC Data CenterDesign, permitting, and construction of a 1M+ GSF high-performance computing campus built for complex simulation, big data, and AI workloads.
Hyperscale Data Center — QuincyDemolition of an existing structure and construction of a two-story, 20MW+ hyperscale data center within an established campus.
Hyperscale Data Center — Boydton 20MW+A two-story, 20MW+ greenfield hyperscale data center with Tier II network, administrative building, loading dock, and multiple colocation rooms.